11 September 2020
«Owner»
«Mailing_Address1»
Kardinya South
«Mailing_Address2»
Underground Power Project
Property Owner Survey
Property Address:
McWhae
«PROP_Addr1», «PROP_Addr2»
Thank you to all the residents who contributed to previous surveys regarding the proposed
Kardinya South State Underground Power Program Project. We are sorry for the delay in
responding to you with the results of the second survey as we hav
- Keith
e been working with
Western Power on the implications for the project.
The purpose of this letter is to:
1.
Advise the residents on the results and implications of the second survey on the
Kardinya South Underground Power Project
2.
Inform residents of the revised proposal from Western Power
3.
Complete a third and final survey to residents
- 20200040
on the acceptability of holding the price
from 2016 (average cost of $4,424 per property)
The second survey results indicated that residents did not support the project at a higher
average cost, with 53% (378) response rate, 39% (146) of property owners supporting the
project and 61% (232) of property owners not suppo
Melville rting the project.
Due to the survey results the project
of was at risk of being cancelled. This would result in the
overhead power lines remaining in place and significantly reduce the likelihood and viability
of this area being considered for underground power in the future. Further to this, a
significant amount of overhead network renewal works wil need to be undertaken.
- City
In recognition of this cancellation scenario and Kardinya South not having the option of
underground power in the future, Western Power reviewed project costing and examined
other opportunities to reduce costs to the project in order to bring them in line with the
average annual costs per property supported in the September 2016 survey.
In response to the State Government’s commitment to provide funding toward stimulus
Release
projects that could be implemented in the short term to provide jobs, support the construction
industry and boost the economy, Western Power has agreed to provide additional funding for
the Kardinya South Underground Power Project to enable the project to be constructed at the
FOI
same average cost as the original survey in 2016 of
$4,424 per property which received
majority support.
The enclosed project facts sheet provides background information and a breakdown of the
estimated charges for different houses and connection types.
Please complete this third and final survey by returning the survey sheet and reply paid
envelope enclosed by
Friday, 2 October 2020.
If the final survey results contain more than 50% of respondents agreeing, the project wil
start during this financial year 2020-2021. Properties wil not be charged until the following
financial year. It wil be included as an item in your 2021-2022 rates notice and a relaxed
payment plan can be arranged for those with financial constraints.
We look forward to receiving your completed survey by
2 October 2020 and wil advise you
of the outcome as soon as possible.
If you have any queries on this matter please contact the City of Melvil e on
1300 635 845 |
9364 0666 or email
melinfo@melvil e.wa.gov.au.
Yours sincerely
McWhae
Mick McCarthy
- Keith
Director Technical Services
- 20200040
Melville
of
- City
Release
FOI
Kardinya South Underground Power Project
Property Owner Third and Final Survey
Please tick the box indicating your choice;
I Do Support
The proposed Kardinya South Underground Power Project
I Do Not Support
McWhae
The proposed Kardinya South Underground Power Project
- Keith
Property Owner:
«Owner»
Property Address:
«PROP_Addr1», «PROP_Addr2»
- 20200040
Melville
of
- City
Release
FOI
Kardinya South Underground Power Project – Facts Sheet
What is Underground Power?
Underground power involves removing existing overhead power lines and poles and taking
them underground. Some of the benefits are:
Improved security and reliability of your power supply
Improved and more efficient street lighting
Safer environment
Safer roads
Improved street view
Improved property values
McWhae
Western Power installs the new underground cabling and streetlights along street verges,
connecting each home to the new system. Then, existing lines and poles are removed and
recycled if possible.
- Keith
Background of Kardinya South Underground Power Project
First Survey (September 2016)
In September 2016 the State Government, through the Public Utilities Office, invited all
affected residents in Kardinya South to take part in a survey to determine the level of support
from property owners for underground power to be installed in the area.
- 20200040
The survey September 2016 survey results indicated that 59.5% of respondents supported
the project, which enabled the project to progress into the detailed design phase.
In the first survey the cost to the property owner was quoted to be an
average total cost of
Melville
$4,424 per property, which at the time was the best estimate based on available information.
Fol owing Western Power’s completio
of n of the detailed design work, the cost of the project
had increased by 24.5% to an average of $5,508 total cost per property.
For this reason, the City of Melvil e in conjunction with the State Underground Power
Program Steering Comm
- City
ittee consisting of representatives from, Western Power, WALGA
and the State Government commenced a second survey in November 2019, which
concluded on 18 December 2019.
Second Survey (December 2019)
The second survey resu
Release lts indicated that residents did not support the project, with 53%
(378) response rate, 39% (146) of property owners supporting the project and 61% (232) of
property owners not supporting the project.
FOI
Due to the survey results the project was at risk of being cancelled. This would result in the
overhead power lines remaining in place and reduce the likelihood and viability of this area
being considered for underground power in the future. Further to this, a significant amount
of overhead network renewal works wil need to be undertaken in the near future.
Current Situation
Third and Final Survey In response to the State Government’s commitment to provide funding toward stimulus
projects that could be implemented in the short term to provide jobs, support the construction
industry and boost the economy, Western Power has agreed to provide additional funding
for the Kardinya South Underground Power Project to enable the project to be constructed at
the same average cost as the original survey in 2016 of
$4,424 per property which received
majority support.
Due to timeframes and the revised average cost we wil be surveying Kardinya South
residents for the third and final time.
If the result is more than 50% of respondents supporting underground power the project wil
go ahead.
McWhae
Estimated Charges ($4,424 average cost)
In establishing the estimated charges, the City has considered the following factors:
- Keith
Property density
kVA requirements as advised by Western Power
The City’s existing differential rating methodology for commercial properties
Any existing infrastructure in-situ
The charges to be levied against a property comprise of two components. These are:
Contribution to works external to the property which includes the new underground
- 20200040
cabling, removal of the existing overhead powerlines, installation of the new street
lighting system and installation of the ground mounted transformer and switchgear
cabinets. This is identified as the
Network Service Charge.
Contribution to the installation of a green dome and the underground cable from the
green dome to the meter box where requi
Melville red. This is identified as the
Network
Connection Fee.
of
The final charges to be levied for each individual property are dependant on the number of
dwel ings on the lot and the type of connection required at the time the project commences.
The estimated underground power charges applicable to different property requirements are
- City
shown below:
Network Service Charge
Properties included in the Kardinya South Underground Power Project wil each be charged
an estimated network service charge per dwelling as follows:
Release
Residential properties up to 2 dwellings
$4,397
Residential properties 3 - 10 dwellings
$3,396
FOI
Residential properties 11+ dwellings
$2,879
Commercial properties with an estimated 15kVA rating
$10,801
Commercial properties with an estimated 35kVA rating
$21,365
Network Connection Fee
Properties included in the Kardinya South Underground Power Scheme which do not already
have a green dome and an underground connection from their meter box to that dome wil
each be charged a full or modified network connection charge per dwelling (as required) as
follows:
Ful Network Connection
Up to 2 dwellings
$1,048
3 - 10 dwellings
$838
11+ dwellings
$681
Modified Network Connection
Up to 2 dwellings
$838
3 - 10 dwellings
$681
McWhae
Commercial Connection Fee
Standard Installation
$1,185
- Keith
When and How would I be Charged? If the final survey results show 50% or more of residents support the project it wil commence
during this financial year 2020-2021. However properties wil not be charged until the
following year and included as an item in your 2021-2022 rates notice.
Please note that pensioners and seniors who are eligible for a State Government funded
- 20200040
Pensioner Rebate may receive a rebate on the above charges or defer payment in
accordance with the provisions of the State Government’s
Rates and Charges (Rebates and
Deferments) Act 1992. The City wil also work closely with residents to help develop
payment plans that match individual financial circumstances.
Melville
Payment can be made in instalments over an extended period of time, incurring a minimal
of
interest charge (currently 2%) which is determined each year by Council. If you are
interested in an extended payment plan please contact the City’s Rates Department on
1300 635 845 | 9364 0666 or
melinfo@melvil e.wa.gov.au when you receive your
2021-2022 rates notice. - City
Release